翻译汉译英,拒绝用有道等在线翻译软件翻译 谢谢

虎岭公路隧道初步设计 摘  要 随着经济的快速发展,交通工程已经成为经济发展的强力驱动与支撑。随着高速公路建设的推进,交通基础设施建设也不断深入,目前隧道工程也已经成为公路系统中的重要组成部分。它对优化道路线形、缩短公路里程有重大影响;同时对促进周边地区环境保护、经济发展及国防建设也具有深远影响。虎岭公路隧道位于陕西省华县境内,属连霍高速公路陕西线西安至潼关段。隧道起点位于虎岭南麓李家沟口处,终点位于虎岭北麓韭菜沟口处,隧道全长1780m。本文对隧道的规划、设计和计算进行了详细的论述。设计的主要内容有:隧道调查,围岩分级、地形与地质调查、气象调查、隧道线型设计、纵、横断面设计,洞口及洞门设计,衬砌结构设计,结构计算,防水与排水、通风设计及运营照明设计。隧道选线时综合考虑了地形地质情况,在衬砌计算中,考虑弹性反力的存在,隧道规划和设计过程中遵循充分发挥隧道功能,安全经济的建设隧道的基本原则,完成整个隧道的初步设计。    最终设计成果包括:设计说明书部分,围岩衬砌计算书,运营通风计算书,运营照明计算书,路线平面图,纵断面设计图,建筑限界及内轮廓图,洞门及明洞设计图,Ⅳ类围岩衬砌设计图,通风机,照明灯具示意图。 关键词:隧道; 结构计算; 衬砌 ; 防排水; 通风;照明

Tiger Mountain Highway Tunnel preliminary design Pick along with the rapid development of economy, traffic engineering has become the powerful driving and supporting economic development. As the highway construction, traffic infrastructure construction also is unceasingly thorough, the tunnel project has become an important part of the highway system. It is to optimize the road alignment, shortened the highway mileage to have the major impact; at the same time to promote the surrounding areas of environmental protection, economic development and national defense construction also has a far-reaching impact. Tiger mountain highway tunnel located in the county of Shaanxi province churchyard, L. Lian Huo freeway line Shaanxi Xi'an to Tongguan. Tunnel starting in the tiger ridge south Li Mizoguchi, at the end of Tiger Hill leek Mizoguchi, tunnel is full-length 1780m. The tunnel plan, design and calculation are discussed in detail. Design of the main contents are: the tunnel surrounding rock classification, survey, topographic and geological survey, meteorological survey, tunnel geometric design, longitudinal, cross-sectional design, portal and portal design, lining structure design, structure calculation, waterproof and drainage, ventilation design and operation of lighting design. Tunnel line selection considering topographical and geological conditions, the lining calculation, considering the elastic force presence, tunnel planning and design process follows the sufficient play tunnel function, safe and economic construction of the basic principles of the tunnel, completed the preliminary design of tunnel. The final design results include: the design specification part, lining calculation, operation ventilation calculation, operation lighting calculations, route plan, profile design, construction clearance and inner contour, portal and the design, type lining design, ventilation, lighting diagram. Key words: tunnel; structure calculation; lining; drainage; ventilation; lighting
温馨提示:答案为网友推荐,仅供参考
第1个回答  2011-11-19
Tiger Ridge summary of the preliminary design of road tunnels with rapid economic development, traffic engineering has become a powerful driver of economic development and support. With the advance of highway construction, transportation infrastructure has continued to deepen, the current highway tunnel project has become an important part of the system. Its optimal road alignment, reduce highway mileage have a significant impact; while the surrounding area to promote environmental protection, economic development and national defense also has far-reaching impact. Tiger Ridge Road, Hua County, Shaanxi Province is located within the tunnel, is even Huo expressway Xi'an, Shaanxi Tongguan line segment. Tiger Ridge is located in the south of the tunnel starting at Lee Mizoguchi, end at the Tiger Ridge at the northern foot of leeks Mizoguchi, tunnel length of 1780m. In this paper, the tunnel planning, design and calculation are discussed in detail. Design of the main contents are: tunnel survey, rock classification, topography and geological surveys, meteorological investigation, tunnels linear design, vertical, cross-sectional design, the hole and Portal design, lining structural design, structural calculations, water and drainage, ventilation design and operation of lighting design. When the tunnel alignment took into account topographic and geologic conditions, in the lining of the calculation, consider the elastic reaction force of the existence of the tunnel planning and design process to follow the tunnel full functionality, security, economic development of the basic principles of the tunnel to complete the preliminary design of the tunnel . The final design results include: design manual part, rock lining calculations, operating ventilation calculations, operating lighting calculations, route plan, longitudinal design, construction limits and within the contour map, Portal design and Myeongdong, Ⅳ class rock lining design, fans, lighting diagram. Keywords: tunnel; structural calculations; lining; waterproofing and drainage; ventilation; lighting
第2个回答  2011-11-20
没分?谁替你翻译啊
相似回答