1.Can these floor be placed over the support (concrete H-Beam) with range between each support is 1 meter?
2.If we want to placed these floor (point no.1) over other floor with range between first decking is 50 cm, can we make it?
3.Please for your suggestion with thickness 10mm,20mm,15mm,25mm,40mm and 35mm how many meter the range for each support should be make